cadence.By Otium

Build your production schedulefrom your ERP in minutes.

Cadence is a fully agentic production scheduler. It learns your plant's rules from the schedules you already have and builds the next one for your team to approve.

Orders, plants, and times are illustrative.

No perfect data required.

Advanced planning systems (APS) assume stable routings, trusted standards, and a team to run the implementation. This doesn't describe most plants. Most plants have changing configurations, imperfect master data, rush orders, and a planner who carries the real rules in their head. Cadence works with the plant you have.

No cleanup project first

Cadence reads the ERP you have. Inconsistent item names, BOM revisions in three formats, and half-filled fields stay visible on the schedule instead of blocking it.

No integration project

Cadence reads your ERP and never writes to it. No cutover, no data migration. Stop using Cadence and your old sheets still work.

No new system on the floor

Your scheduler keeps their judgment. A rush order or a short part at 10 AM? Cadence reworks the afternoon and shows exactly what moved.

Learns the rules nobody wrote down.

Cadence reads the schedules your team already built and turns the habits in them into rules it follows and you can check.

MTWTF
Wk 36
Wk 37
Wk 38
Wk 39
Wk 40
Wk 41

Walnut finish

Rule

Batch walnut finish on Tuesday.

Seen in 5 of 6 weeks

Works with your existing ERP.

Connect the ERP you already run, or start from a spreadsheet export. Upload a schedule you have and Cadence is running in minutes.

  • SAP
  • Oracle
  • Dynamics 365
  • Sage
  • Odoo
  • Excel
  • Google Sheets
  • NetSuite
  • Epicor
  • Infor
  • Acumatica
  • Syspro
  • Any CSV export
  1. 1

    Upload a schedule

    Export a schedule your team already built, from your ERP or a spreadsheet, and drop it in.

  2. 2

    Cadence finds your rules

    It reads how your scheduler grouped, ordered, and split the work, and writes those patterns down as rules you can check.

  3. 3

    It builds the next one

    Cadence builds next week's schedule from scratch, following your rules.

See what each scheduling choice changes.

Cadence shows what a plan protects and what it gives up before anything reaches the floor.

Protect promises

Catch at-risk orders early.

See which orders are drifting toward a missed date while there is still time to change the plan, check material, or reset the promise.

Order 1842

Today
Risk found
Promised Friday
Forecast Monday3 days late
Check materialMove slotReset promise

Use the whole network

Route work across plants.

Move work when another site is a better fit, while keeping the pieces of a complete order together.

Order 1842

Plant A

At capacity

Plant B

Finish line + room

Plant C

No matching finish line

Cadence checks capacity, capability, and the rules that keep an order together before it proposes a plant.

Compare the value

Find the sequence that releases more revenue.

A full plant is not always the best plan. Compare the value and complete orders each sequence can release.

Use the rules no ERP field can capture.

Tell Cadence what the floor knows, in plain language. It works the rule into the next plan for your scheduler to review.

  • Machine 4 is running rough this week.
  • New operator on second shift.
  • Keep this order together.
  • Run the walnut finish at Plant B.
  • Protect this customer's ship date.

What Cadence handles.

The scheduling work that eats the week, done in minutes.

Something changed. Get a new plan.

A machine goes down, a crew comes up short, a rush order lands. Cadence reworks the schedule and shows what moved, while you're still in the meeting.

Can we take this order?

Before sales promises a date, Cadence checks the new order against the plan and shows whether it fits and what it would push back.

Know what's ready to run.

Cadence goes through the backlog for missing parts and wrong routings, so problems turn up before the work reaches the floor.

Keep scheduling when your scheduler is out.

Cadence learns the rules your scheduler works by, so someone else can put together next week's plan and get it right.

See Cadence in action.

Bring the ERP data and scheduling problems you have now.